Product Details
Place of Origin: Changzhou,Jiangsu,China
Brand Name: SUPAL
Model Number: OEM
Payment & Shipping Terms
Minimum Order Quantity: 5PCS
Price: To be negotiated
Packaging Details: 1.One piece in a platic pipe, 10 pieces per group. 2.Use the air bubble paper to encase the plastic pipe. 3.Put the goods encased with air bubble paper in the carton. 4.Other packing will be accept according to your needs.
Delivery Time: 7-15Days
Payment Terms: T/T
Supply Ability: 10000000PCS
Place Of Origin: |
Changzhou |
Coating: |
TiAIN, AlTiN, TiN, No Coating, TIX |
Diameter: |
1-20mm |
Material: |
Carbide, Tungsten Cobalt Alloy |
Flute: |
2/3/4/5/6/8 |
Export Port: |
Shanghai |
Shipping Time: |
4-6days |
Place Of Origin: |
Changzhou |
Coating: |
TiAIN, AlTiN, TiN, No Coating, TIX |
Diameter: |
1-20mm |
Material: |
Carbide, Tungsten Cobalt Alloy |
Flute: |
2/3/4/5/6/8 |
Export Port: |
Shanghai |
Shipping Time: |
4-6days |
1.Selected high-quality raw materials
Grade | YG10X | YG10.2 WF25(Taiwan) | K44 K40 | H10F |
Hardness | HRC45 | HRC55 | HRC60 | HRC65 |
Grain Size | 0.7um | 0.6um | 0.5um | 0.4um |
Cobalt Content | 10% | 10% | 12% | 12.50% |
Flexural strength | 3320N/mm2 | 4000N/mm2 | 4300N/mm2 |
4300N/mm2
|
2.Super Coating
TiN | TiCN | CrN | AlTiN | TiSiN | Nano | DLC | |
Hardness(HV) | 2700 | 3000 | 2500 | 3200 | 3600 | 42(GPA) | 3600 |
Thickness(UM) | 2-6 | 2-6 | 2-6 | 2.5-3 | 3 | 3 | 0.5-10 |
Oxidation Temp(°) | 600 | 400 | 700 | 900 | 1000 | 1200 | 350 |
Friction Coefficient | 0.4 | 0.3 | 0.2 | 0.3 | 0.45 | 0.4 | 0.06 |
Color | Gold | Steel Gray | Silver Gray | Black | Copper | Blue | Silver Gray |
3.Strict measurement sequence Five step test
1.Test the rod after grinding
2.Test when produce the tools
3.Test all parameter after the CNC process
4.Test flutes after coating
5.Test the packing before shipping
4.Packaging Shipping
1.Laser brand and dimensions on the body of cutters, print labels.
2.5PCS or 10PCS each group,sealed with air bubble wrap, pack into bigger carton.
3.Air express such like DHL,TNT,FEDEX,China post as your requirement.We will make sure the delivery cost is lowest.
5.Delivery Time
1.For samples, we dispatch your tools in 2-7 workdays.
2.For formal orders, We delivery tools in 7-30 workdays.